More Tug Pics

She is about six or seven weeks out from completion.  Work continues on the exterior and interior.  The galley is coming together with the installation of the countertops, cabinetry elements continue, electronics and systems are going in, and the roof over the cockpit is put in place.

img_0344
The cabinet for the refrigerator is in place. Since we are doing a VitriFrigo, which is not the standard fridge, our cabinet is slightly larger and the steps are slightly narrower than the standard boat.
img_0345
This is the cabinet for the washer/dryer unit.
img_0347
Electronics, electronics and more electronics. This is not a simple boat!
img_0351
The galley countertop being prepared in the shop.
img_0352
The seating in the main salon, with drawer, mechanical systems and ducting beneath.
img_0353
The ceilings in the forward cabin are maple instead of sepele to lighten things up.
img_0354
And the galley countertop goes in.

 

2 thoughts on “More Tug Pics”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s