The boat finally arrived at New England Boatworks on Thursday, June 8 at about 12:30 in the afternoon. Thanks to the quick response by our driver, Alan, and the NEB travel lift crew, she was floating by 1:20. After so many delays getting her here, including a 10-day stint at a truck stop in Maryland waiting for permits, this quick splash was a welcome relief. She was very dirty from all the road filth, but aside from that and a few superficial scrapes from tree branches and other flying debris, she was in great shape. Continue reading Putting Her Back Together→
She is about six or seven weeks out from completion. Work continues on the exterior and interior. The galley is coming together with the installation of the countertops, cabinetry elements continue, electronics and systems are going in, and the roof over the cockpit is put in place. Continue reading More Tug Pics→
The engine, a Cummins 480 HP QSB-6.7, is en-route by truck from Cummins to American Tug at Tomco Marine in the Pacific Northwest. While the project waits for the engine’s arrival, build progress is slow, but there’s still good stuff happening.
Over the last month, interior components have been constructed on the shop floor, the deck (which is still independent from the hull) is being worked on, electrical systems are being assembled, and some components have been installed in the hull. Continue reading The Tug Takes Shape→
All things fun (and tasty) in the life of the Beards